Robern CRAFT Serie Instrucciones Importantes De Seguridad página 11

Ocultar thumbs Ver también para CRAFT Serie:
Tabla de contenido

Publicidad

SECURE THE VANITY
CAUTION: Risk of product damage. Drill pilot holes into the back rail to provide support and to prevent shifting of the vanity.
1. Using a drill bit, drill two pilot holes through the back rail and into the finished wall and blocking.
2. Secure the vanity to the wall and blocking with two screws* and washers (not provided). Shim as required to keep the vanity level.
3. Reinstall drawers (See page 11).
1
* Robern recommends using at least two construction screws to secure the vanity to the wall. Use screws that are long enough to pass
through the vanity back rail, the finished wall, and into the blocking. Larger vanities may require more than two screws to secure to the
wall.
© 2021 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
Part no. 209-1416 07/21/2021
11
800.877.2376
www.robern.com
Craft Series & Curated Bath Vanity

Publicidad

Tabla de contenido
loading

Tabla de contenido