FLOOR INLET INSTALLATION

FLOOR
INLET
INLET
EXTENSION
2
/
"
9
16
FLOOR
SUB-FLOOR
MOUNTING
BRACKET
FIGURE 41

FINAL SYSTEM CHECK

Be sure all inlets are closed and soil bag is in place. Check
switch on power unit for manual on/off operation. Check that
indicator light on side of power unit is lit and is in green mode.
Check each wall inlet to be sure contacts activate power unit
when hose is inserted and switched on, if applicable. If using
CI370 Indicating Inlet, be sure LED on inlet is green when hose
is inserted/switched on. If Central Cleaning hose is not available
at the time, a short piece of wire can be used to short contacts in
wall inlet to activate power unit. Check each wall inlet and tubing
connection for air leaks. Check power unit for leaks around inlet
tube and dirt receptacle.
All manuals and user guides at all-guides.com
3
1
/
"
16
FRAME
SEAL
FLANGED
FITTING
CUT TO
LENGTH
EXTENSION
SLEEVE
FLANGED
FITTING
FLANGED FITTING
TUBING
Make sure the filter bag is properly installed in the power unit
according to directions printed on the bag or in homeowner's
manual. Remove the extra bag and owner's manual from the
power unit dirt receptacle. It may be convenient to store them
with the cleaning tools and accessories.
Now it's time to enjoy the benefits of a NuTone Central Cleaning
System.
MOUNTING
BRACKET
FLANGE
FIGURE 42
WALL
INLET
INLET
EXTENSION SLEEVE
BRACKET
FIGURE 43
11

Publicidad

Tabla de contenido
loading

Tabla de contenido