Instructions
The LED indicators [H] signal the presence of the mains voltage on the input terminals
and the proper operating capacity of the switching power-supply unit and its batteries.
The Fault signal can be obtained through the "STATUS" input [F] via the two Open-
Collector outputs "OC1" and "OC2".
Signalling
Switching power-supply unit
Green LED (DL1)
Yellow LED (DL2)
Mains operating properly
Yellow LED (DL3)
Batteries operating properly
Output OC1
Output OC2
Mains operating properly
Removal of the jumper from the Earth fault signalling connector [I] deactivates the
Earth fault check.
If this appliance is used with a control panel all the obligatory status and fault signals
must be provided for and made available.
IPS24060G must be installed inside a fireproof enclosure (e.g. the control panel metal
case).
Using the two mounting holes [J], secure the device into its housing.
Connect the mains wiring to the input terminal board [A].
This appliance must be earthed.
Using the plastic cable band, bunch the mains wires and fasten them close to the mains
wire entry on the Switching power-supply unit.
The cables used for the wiring of the product must have an adequate section and
comply with the IEC 60332-1-2 or IEC 60332-2-2 standards.
For an installation that meets standard requirements, it is necessary to fit a suitable
sectioning device (bipolar) and protection on the electrical-wiring upstream of the
switching power-supply unit in accordance with the laws in force (DM37/08).
The output voltage can be drawn from either terminals [C] ("+V, -V"), or from the
connector [D] ("+V, -V").
The output connector is also has "FAULT" and "RTH" terminals which are reserved for
connection to INIM control panels.
If you are installing a ProbeTH thermal probe, connect it to connector [E].
Attach the thermal probe to one of the batteries in such a way as to achieve an optimal
level of thermal conductivity.
The backup batteries of the equipment power supply are not included. The installer must use only
valve regulated lead-acid batteries (VRLA) for stationary use, compliant with IEC 60896-21 and
IEC 60896-22 standards.
The battery casing must have V-2 flame rating or higher.
If this appliance is used with a fire detection control panel, it is obligatory to fit it with a thermal
probe.
The following maintenance operations must be performed regularly:
•
Check that all wiring and connections are intact.
•
Check that the appliance is operating properly.
•
Check the battery efficiency.
These maintenance operations must be performed by qualified persons only.
Switching power supply/Battery charger providing 60W @ 27.6V
Signalling
Off
Off
Operating properly
Installation
Maintenance
On
Switching power-supply unit
operating
Mains operating fault
Battery fault
Switching power-supply unit
fault
Mains operating fault
Blinking
fast
slow
Overheated
Output overload
Earth fault
/
/
/
ATTENTION!
Note
Note
/
/
/
/
5