1
VANITY INSTALLATION
1. Place vanity cabinet (A) into desired
location. Check if the vanity is level from
front to back and side to side.
2. If the vanity needs leveling, place wood
shims (not included) under the vanity to
level it.
3. Check for level again.
4. Using screws (not included) secure
cabinet to wall.
5. Trim o any exposed shims.
2
CHINA TOP INSTALLATION
1. Place a bead of latex caulk around the
top edges of the vanity.
2. Carefully place the vitreous china top
(B) onto vanity. Wipe o excess caulk
with a damp sponge. Allow the caulk to
completely dry.
3
DRYING TIME
1. Avoid moving the vitreous china top
and allow the top to dry for at least 24
hours to allow for proper top adhesion
to the vanity.
4
KNOB INSTALLATION
1. Place machine screws through predrilled hole in door
or drawer. Line up knob with machine screw and
tighten with screw driver.
2. Repeat process for all additional doors and/or drawers.
2
A
B
A