Descargar Imprimir esta página

nvent Raychem SC-JBP-S-A Manual De Instrucciones página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

KIT CONTENTS
Item Qty
Description
A
1
Stand assembly
B
1
Grommet plug
C
1
Cable lubricant
D
16
Tape strips
E
1
Green/yellow tube
F
4
Coils Kester
®
48 core LF solder for nickel
G
10
Thomas & Betts splices, spares included
H
3
Cold leads
I
1
Ground lead
J
1
Junction box with through hole for 1" NPT fitting
K
1
Lid
L
1
Spanner
M
1
Strain relief
NVENT RAYCHEM HEATING CABLE TYPES
Heating Cable Construction
2 and 3SC30, 40 and 50 (-CT)
2 and 3SC/H30, 40 and 50 (-CT)
2 and 3SC/F30, 40 and 50 (-CR)
Plated copper conductor
1
• Allow approximately
24 inches (60 cm)
of heating cable for
installation.
• Cut off heating cable end
at a 45° angle for easier
insertion.
2 | nVent.com
Tinned-copper braid
Inner jacket
Conductor insulation
Fiberglass braid (2SC, 2SC/H only)
2SC, 2SC/H, 2SC/F
24 in.
(60 cm)
A
B
C
D
E
F
G
H
Outer jacket
Fiberglass braid (3SC, 3SC/H only)
Plated copper conductor
3SC, 3SC/H, 3SC/F
2
Do not remove
box nut from
stand.
Push
heating cable
through stand and
nut as shown. Use
cable lubricant if
needed.
Outer jacket
Tinned-copper braid
Inner jacket
Conductor insulation
18 in.
(45 cm)
Box
nut
M
L
K
J
I
• Square off
cable end with
90° angle cut.
• Do not attach
stand to pipe
until step 8.

Publicidad

loading

Productos relacionados para nvent Raychem SC-JBP-S-A