Briggs & Stratton Generac Generator Discount Parts Call 606-678-9623 or 606-561-4983
OPERATION
OPERATING THE
GENERATOR
Starting the Engine
Disconnect all electrical loads from the generator. Use the
following start instructions:
1.
Make sure unit is on a level surface.
IMPORTANT: Failure to start and operate unit on a level
surface will cause the unit not to start or shut down during
operation.
2.
Turn both fuel valves to "On" position (Figure 4). Fuel
valve handle under the fuel tank should be vertical
(pointing toward ground) for fuel to flow.
Figure 4 — Fuel Valves
Fuel Valve is shown
in the On position
3.
Make sure idle control switch is in "Off" position
(Figure 5).
Figure 5 — Idle Control Switch
4500W Portable Generator
AND
www.mymowerparts.com
4.
Start engine according to instructions given in engine
operator's manual.
WARNING
Rapid retraction of starter cord (kickback) will
pull hand and arm toward engine faster than
you can let go.
Broken bones, fractures, bruises or sprains could
result.
• When starting engine, pull cord slowly until resistance is felt
and then pull rapidly to avoid kickback.
• NEVER start or stop engine with electrical devices plugged in
and turned on.
NOTE: If engine starts after 3 pulls but fails to run, or if
unit shuts down during operation, make sure unit is on a
level surface and check for proper oil level in crankcase.
This unit may be equipped with a low oil protection device.
See engine operator's manual.
WARNING
Running engines produce heat.Temperature of
muffler and nearby areas can reach or exceed
150°F (65°C).
Severe burns can occur on contact.
Exhaust heat/gases can ignite combustibles,
structures or damage fuel tank causing a fire.
• DO NOT touch hot surfaces and avoid hot exhaust gases.
• Allow equipment to cool before touching.
• Keep at least 5 ft. (152 cm) clearance on all sides of generator
including overhead.
• Code of Federal Regulation (CFR) Title 36 Parks, Forests, and
Public Property require equipment powered by an internal
combustion engine to have a spark arrester, maintained in
effective working order, complying to USDA Forest service
standard 5100-1C or later revision. In the State of California a
spark arrester is required under section 4442 of the California
Public resources code. Other states may have similar laws.
Connecting Electrical Loads
• Let engine stabilize and warm up for a few minutes after
starting.
• Plug in and turn on the desired 120 and/or 240 Volt AC,
single phase, 60 Hz electrical loads.
• DO NOT connect 240 Volt loads to the 120 Volt duplex
receptacles.
• DO NOT connect 3–phase loads to the generator.
9
PowerBOSS™