Installation; Installing/Replacing The Lamp; Overhead Rigging - EuroLite GKF-250 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

Installing/Replacing the lamp

Before replacing the lamp, unplug mains lead and let the lamp cool down (approx. 5 minutes).
During the installation do not touch the glass-bulbs bare-handed! Please follow the lamp manufacturer's
notes!
Do not install lamps with a higher wattage! Lamps with a higher wattage generate temperatures the device
was not designed for. Damages caused by non-observance are not subject to warranty.
Do only replace the lamp with an ELC 24 V/250 W GX-5.3 lamp.
Procedure:
Step 1: Unscrew the fixation-screws of the service lid on top of the housing.
Step 2: Remove the service lid.
Step 3: If replacing the lamp, remove the old lamp from the lamp-socket.
Step 4: Insert the new ELC 24 V/250 W GX-5.3 lamp into the lamp-socket.
Step 5: Replace the service lid and tighten the screws.

Overhead rigging

The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
DANGER TO LIFE!
Only install the lamp with the device switched off!
Unplug from mains before!
CAUTION!
The lamp has to be replaced when it is damaged
or deformed due to the heat!
Do not operate this device with opened service lid!
17/37
00021819.DOC, Version 1.2

Publicidad

Tabla de contenido
loading

Tabla de contenido