Symmetry Signature Railing Installation Instructions - 6-ft. and 8-ft. Stair
20
Position the crush block and holder into the
bottom rail, and locate the two screw holes.
Remove the holder and pre-drill using a
1/8-in. drill bit. Reposition the crush block and
holder, and secure with the supplied #8 x 1-in.
screws. Do not over-tighten.
21
Carefully position the pre-assembled railing in-
fill between the posts, then slowly lower over
the bottom brackets until fully seated.
Please visit https://www.fiberondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
22
Center the H-bar on the post and check rail
for plumb.
23
Starting at the top, secure the H-bar to
the posts at both ends using the supplied
#10 x 2-1/2-in. self-drilling pan head screws.
Do not over-tighten.
24
Position the top rail over the infill assembly,
and carefully lower into place.
The most recent installation instructions can be found on our website.
25
Using supplied 1-7/8-in. screws, secure
the top rail starting as close to the post as
possible. Space the remaining screws evenly.
26
Complete the assembly by gluing the post
caps in place with a quality exterior-grade
adhesive.
10