PREPARE THE CASE
4
NOTE: Attach curtains to the air conditioner before
placing the air conditioner in the window.
A
Install top mounting rail with four type A screws.
Slide left-hand curtain assembly into left end of
B
top and bottom mounting rail. Repeat for right
hand curtain assembly.
C
Fasten curtain retainer strips to the sides of the
outer case with four type A screws on each side.
PREPARE WINDOW FOR INSTALLATION
5
A
Measure the width of the window opening.
B
Mark the center line on the inside windowsill.
A
B
A. Width of window opening
B. Center line
Installation Instructions
C
D
10
INSTALL OUTER CASE IN WINDOW
5
Place outer case in window. Lower sash until it
A
rests behind front flange of top mounting rail.
Bottom mounting rail must rest behind window
sill.
Top rail
Window sash
SILL
Expand the curtain panels to fill the window.
B
Secure with type C wood screw in top and bottom
corners. If needed, use drill and 1/8" bit to drill pilot
holes for the screws.
Use three type C screws to secure the case to the
C
window sill. Drill pilot holes if necessary.
About
5˚
Bottom rail