Operating Instructions - Blumfeldt Gold Bar 2000 Manual Del Usario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3.
Fixed the bracket using three
ST4*35 screws and make
sure the installation points
are fixed securely.
4.
Before fixing the heater, make
sure the rocker power switch
on the right side and then
fixed the bracket to the heater
using two M6*14 screws and
butterfly nuts.

OPERATING INSTRUCTIONS

The rocker power switch on the right
side controls power on/off.
EN
15

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

1003024710031513

Tabla de contenido