GE CP350 Instrucciones De Instalación página 4

Ocultar thumbs Ver también para CP350:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARING THE OPENING
4 CUTOUT DIMENSIONS
OF THE COUNTERTOP
To insure accuracy, it is best to make a template
when cutting the opening in the counter.
28-1/2"
length of
1-3/4" Min. Between
cutout and the wall
behind the cooktop
2-1/2" Min. from front edge
of cutout and front edge of
countertop
JXTR32X CUTOUT FILLER TRIM KIT:
A filler trim kit is available for use if your countertop
cutout is larger than the dimensions shown, up to
29-13/16" x 20-7/16". O rder JXTR32X to reduce the
cutout opening for installation of this cooktop. This
kit may be ordered from your GE Dealer.
5
Make sure the wall coverings, countertop and
cabinets around the cooktop can withstand
heat (up to 200°F) generated by cooktop.
Wall covering,
cabinets and
countertop must
withstand heat up
to 200°F.
Installation Instructions
19-5/8" width of cut
cut
(Cont)
6
For Americans with Disabilities Act (ADA)
Forward Approach Installation Only:
For models with
no drop box,
allow 5" minimum
depth between the
countertop and an
enclosure.
For models with
a drop box, allow
6-1/2" minimum
depth between the
countertop and an
enclosure.
(PP945)
NOTE: The enclosure must be made of wood
material. Also, an access panel is required for the
junction box, hold-down brackets, and service.
4
5"
6 1/2"
Drop
box

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Jp336Jp340Jp346Jp356Pp912Pp932 ... Mostrar todo

Tabla de contenido