GE AEW06 Serie Manual Del Propietario E Instrucciones De Instalación página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WINDOW REQUIREMENTS
1
These instructions are for a standard double-hung
window. You will need to modify them for other types
of windows.
The air conditioner can be installed without the
accordion panels if needed to fit in a narrow
window. See the window opening dimensions.
All supporting parts must be secured
to firm wood, masonry or metal.
The electrical outlet must be within reach of the
power cord.
22 to 36
(With accordion panels)
STORM WINDOW REQUIREMENTS
2
A storm window frame will not allow the air
conditioner to tilt toward the outside, and will keep it
from draining properly.
To adjust for this, attach a piece of wood to the sill.
WOOD PIECES
WIDTH: 2"
LENGTH: Long enough to fit inside the window
frame.
THICKNESS: To determine the thickness, place a
piece of wood on the sill to make it 1/2" higher than
the top of the storm window frame or the vinyl
frame.
Attach securely with nails or screws provided by the
installer.
1/2 higher
than storm
window
frame
Storm window
frame
Installation Instructions
15 ½" min.
1/2 higher
than vinyl frame
(on some windows)
Wood
Sill
Vinyl frame
PREPARE THE AIR CONDITIONER
3
Hold the accordion panel in one hand and
A
gently pull back to free the open end.
Slide the free end of the accordion panel into
B
the side panel rails. Slide the panel down. Be
sure to leave enough space to slip the top
and bottom of the frame into the rails on the
cabinet.
NOTE: There is a right and a left accordion
panel. Be sure to use the proper panel for each
side.
Slide the left and right accordion panels into
C
the top and bottom mounting rails.
Top left
Bottom mounting rail
9
Top right
Top mounting rail

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido