Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ENGLISH

4. HOW TO USE

1. Place the lifting tower over a firm and flat
surface on its working place.
2. Remove the safety pin (V), pull down the
handle (W) until the safety pin (V) is adjusted
to the needed position.
3. Put the load on top of the lifting tower
using the suitable support, in order to make
the load work only vertically. The minimum
load must be 25kg. It is possible to manually
block it with the safety pins (A).
4. Elevation: Turn the winch handle (B) cloc-
kwise to lift the load until the wished posi-
tion, checking that safety pins (A) are activa-
ted (T).
5. Lowering: Release the safety pins (A) in po-
sition (T). To release them, turn slightly the
winch handle to elevate the load. In the nor-
mal working position, the load's weight does
not allow to release the safety pins. Once the
safety pin (A) is unblocked, turn the winch
handle (B) anticlockwise until lowering the
load and the first profile is completely down.
Release the safety pins (A) and keep on lowe-
ring the lifting tower until the second profile
is completely down. Unblock the safety pin
(A) and continue lowering the lifting tower
until it is completely folded at its minimum
height. The lifting tower can be fixed at any
14 14
needed intermediate position as well as when
raising the load, fixing the safety pin (A) in
the position (S).
6. For the lifting towers' transport it is neces-
sary to bring down all the profiles, releasing
the safety pin (A) in its position (T). Fix the
profiles with the safety pins (A) in the posi-
tion (S). Pull the handle (W) until the safety
pin (V) is adjusted into the nearest hole to the
winch.
Fig. 1
S
T
A
B
V
W

Publicidad

Tabla de contenido
loading

Productos relacionados para Fenix NEMESIS PRO

Tabla de contenido