Pfister KENZO LG42 Serie Manual De Instrucciones página 3

Ocultar thumbs Ver también para KENZO LG42 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7
7D
7B
7C
7 SECURING FAUCET
From underneath sink, secure Faucet Body (7A) by placing Metal Washer (7B) and
7
threading Long Nut (
Hex.) (7C) onto Mounting Post (7D). Make sure that the bumps
/
16
on Metal Washer (7B) are facing up. Firmly hand tighten Long Nut (7C). Secure Long
1
Nut (7C) not to exceed a
/
turn.
4
Caution: Do not over tighten!
8
A
B
8 FLUSH WATER LINES
A. Point lines into Bucket. TURN WATER BACK ON.
B. Flush the water lines. Allow water to run for at least 30 seconds. TURN WATER
BACK OFF BEFORE CONTINUING INSTALLATION.
ENGLISH
7A
3
9
9A
9D
9B
9C
HOT
9 WATER SUPPLY LINES
Gently separate hot and cold Supply Tubes (9A), approximately three inches apart.
Connect water Supply Lines (9C) to Faucet Inlets (9B). Hot water supply line goes to hot
inlet fi tting indicated by red tag (9D). (Supply lines not included). Follow manufacturer's
instructions when installing supply lines.
Hold the Faucet Inlets (9B) steady using an adjustable wrench while tightening Supply
Lines (9C). Do not twist Supply Tubes (9A)!
10
10 POP-UP ROD CONNECTION
Insert Lift Rod (10A) into hole at the back of Faucet Body (10B).
9A
9B
9C
COLD
10A
10B

Publicidad

Tabla de contenido
loading

Tabla de contenido