Instructions
This guide presents the basic steps to set up and operate this device.
For the user manual and specifications, visit intellinetnetwork.com. Register your product at
register.intellinet-network.com/r/561198 or scan the QR code on the cover.
Placement
Prior to use, it is recommended that the switch be placed/positioned:
• on a level surface that can support the weight of the switch
(and any other items that need to be considered);
• with a minimum of 25 mm (approx. 1") of clearance on
the top and sides for adequate ventilation;
• away from sources of electrical noise: radios, transmitters, broadband amplifiers, etc.;
• where it cannot be affected by excessive moisture.
The switch includes brackets and
screws for optional rack mounting.
1 Disconnect any cables from the switch.
2 Position a bracket over the mounting
holes on one side of the switch and
secure it in place with screws.
3 Repeat Step 2 on the other
side of the switch.
4 Position the switch in the rack and
screw the brackets to the rack.
5 Reconnect any cables.
Chassis Ground Column
Located on the side of the power supply connector, a grounding terminal
connector is used to provide proper grounding for your Intellinet Network
Solutions switch. If you use the chassis grounding screw, it should be wired to
an object that provides earth ground. In rackmount installations, grounding
is typically provided by the metal frame of the mounting rack.
2
English
16-Port Gigabit Ethernet PoE+ Web-Managed Switch with 2 SFP Ports