Final Inspection / Inspección Final / Inspeção Final - Geobrugg GBE-2000A Manual

Tabla de contenido

Publicidad

13
Final inspection / Inspección final / Inspeção final
Once installation has been completed, the following aspects in particular must be inspected:
a)
Are the support ropes and the lateral rope connected to the correct anchors?
b)
Are the rope guides at the top and bottom of the posts installed correctly?
c)
Have the correct number of loops been left free on the left and right of the posts?
d)
Is the net correctly fastened to the support ropes?
e)
Have the correct number of wire rope clips been attached to the ends of the rope?
f)
Are the wire rope clips installed correctly?
g)
Has the correct torque been applied to the wire rope clips?
h)
Are the nets connected correctly?
i)
Are the end nets correctly fastened to the vertical ropes?
j)
Is the sag of the top support rope less than 3% of the distance between the posts?
Please consider the maintenance manual.
© Geobrugg AG, Switzerland
43/48
GBE 2000A

Publicidad

Tabla de contenido
loading

Tabla de contenido