8. Plug power cord connector into the
power jack in the back of the appliance.
Plug the power adapter into a standard
electrical outlet. Extra cord should be
hung over cord management hooks be-
hind unit
.
[ e ]
CautIon: Make sure power cord does not fall into the roll.
note: If you wish to conceal the power cord, drill a 10 mm hole through the bottom of the
cabinet floor at the rear and to the side of the cabinet. Now the power cord connector can be
run down through the 10 mm hole and connected to the power jack. The power adapter can
be plugged into a standard electrical outlet available inside the cabinet. If this outlet is not
available then one can be installed by a qualified electrician.
9. Your CLEANCut appliance is now ready for use! For operating instructions, see the
How to uSe section of this manual.
overhang lIp InStallatIon
Important: Always wear protective glasses or goggles to prevent injury when drilling.
1. Clear counter top under installation area
to avoid getting dust or debris on other
appliances or items. Open cabinets and
remove contents to make mounting easier.
2. Fold mounting template along Over-
hang Lip Fold Line. Place template under
cabinet with fold line flush against inside
overhang, and tape securely in place
note: Use center line to align unit with center of cabinet if desired.
Important: Do not align screw holes on template with the partition between cabinets, as
this will prevent you from installing the appliance properly. Pay close attention to where the
drill holes will be set so as not to damage your cabinets during mounting. Drilling through your
cabinet's partition may cause damage to cabinets and prevent proper installation.
3. Drill from under the cabinet up. Drill holes through the 4 places marked on the template
using a 7 mm drill bit.
Important: Always ensure you are drilling straight up through the marked mounting
hole on the template. Drilling at an angle may prevent proper installation and may damage
cabinets if the drill bit pierces the partition.
46
[ e ]
[ f ]
.
[ f ]
4. Once holes are drilled, remove tape and
mounting template and save template
with your instructions in case you move
or wish to remount at a later time.
5. Wipe dust and debris off inside cabinet
surface. Also, make sure under side of
cabinet is clean.
6. Place a washer inside the cabinet over each of the 4 holes you drilled.
7. Now, use your ruler or the paper ruler provided to measure the overhang height, placing
your ruler vertically against the underside of the cabinet behind the overhang
measurement is less than 1-3/4", you may skip step 9. If it is greater than 1-3/4", this
number determines the number of spacers you need, using the Spacer MountIng
guIde found below.
8. Drop one of your screws through each
of the washers covering the holes in the
cabinet, from inside the cabinet down.
9. Place the appropriate number of spacers
determined in step 7 on each screw so
the appliance will be even with the front
overhang
.
[ h ]
note: For spacer installation, you may require assistance (in mounting) in order to hold
spacers in place while securing the appliance at the same time. If assistance is not available,
use pieces of tape to hold the spacers in place while you position the appliance.
SpaCer mountIng guIde
measUremenT spacer
44 mm or less
None
46 mm
1,5 mm
49 mm
5 mm
[ g ]
. If this
[ g ]
[ h ]
measUremenT spacer
51 mm
6 mm
52 mm
6 mm + 1,5 mm
56 mm
6 mm + 5 mm
47