ASSEMBLY INSTRUCTIONS:
NOTE: All fasteners should be only "hand tight" until
Step 12.
1.
Attach front legs (2) to the base (1) using bolts
(16), washers (22) and nuts (15).
2.
Attach post support (5) into front legs (2) using
bolts (29), washers (26) and nuts (25).
3.
Assemble casters to rear leg extensions (3) using
bolts (12), washers (32) and hex nuts (13).
4.
Slide rear leg extensions (3) into base (1) with
caster wheels facing down and secure with bolts
(14).
5.
Slide front leg extension (4R) into front leg (2),
slide left front leg extension (4L) into front leg
(2). Stand behind the crane as if you were going
to push the crane to determine the left side of
the crane from the right side of the crane.
CAUTION: The leg extension is installed correctly
when the wheel is pointing straight ahead.
6.
Connect main support post (6) to the rear
support (5) using bolts (28), washers (26) and
nuts (25).
7.
Connect support straps (7) between front legs (2)
and the top of main support post (6) using bolt
(16) (Note: same bolts used in Step 1), washer
(22) and nut (15) at the bottom and bolt (17),
washer (22) and nut (15) at the top.
8.
Connect boom (9) to the main support post (6)
using bolt (19), washer (20) and nut (21).
9.
Slide boom extension (10) into boom (9) making
sure that the slot for chain and hook faces down.
Secure with bolt (24), washer (26) and nut (25),
at desired capacity.
10. Connect hydraulic ram (8) to the main support
post (6) using bolt (27), washer (22) and nut (15)
and to the boom using bolt (31), washer (22) and
nut (15).
11. Install hook and chain (30) to the boom
extension (10) using bolt (24), washer (26) and
nut (25).
12. Tighten all fasteners.
OPERATING INSTRUCTIONS:
1. Refer to vehicle manufacturer's approved service
manual for proper engine removal procedure.
2. To raise load, close release valve by turning pump
handle clockwise. Insert handle into handle
sleeve and pump to raise boom to desired height.
3. To lower load, SLOWLY turn release valve
counter-clockwise.
1402-PVA
P
B
ARTS
REAKDOWN
IMPORTANT SAFETY INFORMATION:
Read these safety warnings before operation.
WARNING
Failure to heed these warnings may result in loss
of load, damage to engine crane, and/or engine
crane failure resulting in personal injury or property
damage.
WARNING!
Do not overload engine crane beyond rated capacity
of each specified boom position. Overloading can
cause damage to or failure of the crane.
Always use crane on hard, level surface capable
of sustaining the load. Use of crane on other than
hard level surfaces can result in crane instability and
possible loss of load.
Boom and load must be in lowest possible position
before moving. Move load slowly and smoothly to
avoid uncontrolled swinging and possible loss of load.
Never work under load.
SPECIFICATIONS:
Max. Boom Ht.
Min. Boom Ht.
Boom Capacity
Boom Ext.
From End to Ram
Base Dimensions - Extended
Width Back . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48"
Width Front. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41"
Base Dimensions - Retracted
Width Back . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33-1/2"
Width Front. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31-1/2"
Power Unit . . . . . . . . . . . . . . . . . . . . . . . . . . Heavy Duty
Net Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 205 Lbs.
Gross Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215 Lbs.
& O
M
PERATING
ANUAL
2
Pos. 1
Pos. 2
Pos. 3
95-1/2" 89-1/2" 82-3/4"
8-1/2
13-1/2" 17-3/4"
1/2 Ton
1 Ton 1-1/2 Ton 2 Ton
55"
51"
38-1/2" 29-3/4"
Pos. 4
77"
18"
Rev. 11/14/01