Lba Home Appliance Taunus Manual De Instrucciones página 15

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

EN
TAUNUS
For wood ceilings
Remove the cross pin bolt and R-pin
from the lower part of the downrod.
Unscrew the 2 svrews from the hanger
ball.
x2
For concrete ceilings
Slide the hanger ball down and remove
the bolt.
Insert the canopy cover and the canopy
on the rod. Pass the cables carefully
through the rod.
Relocate the bolt in the hanger ball. Put
the hanger ball in place.
Loosen the 2 coupler screws to insert
the downrod. Insert the bolt and lock it
with the R-pin. Tighten the 2 screws in
the coupler and place the canopy cover.
LBA H
A
ome
ppliAnce
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

129090302129090342

Tabla de contenido