zzz place to be full bed
STEP 5
Attach side rails to headboard and footboard. Once the
side rails are inserted into the four posts, firmly push the
rails down. This will ensure the rails are securely inserted
into the headboard and footboard. Install levelers (10)
into center supports (I) and side supports (J). Attach
center supports (I) to end slats (K) & center slat (L).
Attach end slats (K) to side rails with flat head screws (7).
Fasten center slat (L) and side supports (J) to side rails
with washers (4), spring washers (5) and bolts (11). Use
Allen key (9) to tighten bolts (11). Adjust levelers (10) to
ensure the supports are flush to the floor.
11
7
K
7
I
I
10
10
J
10
10
9
9/10
cama doble zzz place to be
PASO 5
Fije los rieles laterales a la cabecera y al pie de cama.
Una vez que los rieles laterales se insertan en los cuatro
postes, empuje firmemente los rieles hacia abajo. Esto
asegurará que los rieles se inserten con seguridad dentro
de la cabecera y el pie de cama. Instale los niveladores
(10) dentro de los centros de soporte (I) y los soportes
laterales (J). Fije los soportes centrales (I) a las láminas
de extremo (K) y a la lámina central (L). Fije las lámi-
nas del extremo (K) a los rieles laterales con tornillos
de cabeza plana (7). Asegure la lámina central (L) y los
soportes laterales (J) a los rieles laterales con las ron-
danas (4), rondanas de presión (5) y pernos (11). Use
la llave Allen (9) para apretar los pernos (11). Ajuste los
niveladores (10) para asegurar que los soportes estén
nivelados con el suelo.
9
11
5
4
L
J
I
10
K
I
10
7
L
I
10
5
4
7
7
10