Connect the drain line
The sample waste from the instrument must be collected in a compatible
waste container. Monitor the liquid level in the waste container to prevent
overflow. Dispose of waste in accordance with local, state and national
environmental regulations.
Install or remove the docking module
Docking modules are available for single or multiple-container sampling.
Install the small-vial clamp
The optional small-vial clamp connects to the docking module with 2
screws.
Connect the power cord
A power supply unit is used to supply power to the instrument.
Remove the magnetic stirrer
The magnetic stirrer in the docking module can be removed if necessary.
English 13