Atlantic PV1700 Manual Del Producto página 9

Ocultar thumbs Ver también para PV1700:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

underlayment, leaving the edges above the finished grade all around. An additional layer of
underlayment may be added for greater security.
Set the Pump Vault in the deep pocket, then install the Eco-Blox. The top of the field of
blocks should be level. Pull the liner up snugly without lifting the blocks and fold it over
the top of the Eco-Blox, then do the same with the underlayment. Backfill evenly all the
way around the blocks in 6" lifts, tamping the soil in as you go, being careful not to push
the Eco-Blox out of place, until the fill reaches the top of the blocks. Grade outside of the
reservoir to create a bowl that will return splash to the reservoir. Creating a slight berm at
the outer edge of the bowl will keep runoff from entering the basin.
Accessories
Triton Check Valve
Locate the model number of the Atlantic Pump
Vault and TidalWave pump used for this
installation on the chart. Follow the
corresponding column down and row across
until they intersect. The number or letter at the
intersection point is the 'perfect cut' reference
mark for this installation. If the corresponding
reference mark is a letter, then the 1½" threaded
end of the discharge pipe will be used. If the
corresponding reference mark is a number, then
the 2" threaded end of the discharge pipe will
be used.
Discharge Pipe 'Perfect Cut'
Reference Chart
Shaded areas denote pumps that exceed
maximum flow rates or dimension for use with
the corresponding Pump Vault. Use of this equipment combination is not recommended
and could void the warranty.
* For use with Pump Vault Extensions, the discharge pipe can be extended using a
coupling and 2" Sch40 PVC pipe.
* 'Perfect Cut' dimensions specified are for use in Pond-free applications using the cut off
outlets on the rear of the PV1700. If using the PV1700 exiting from the front flat panel,
add 2" to the 'Perfect Cut' mark specified for the pump being used.
AF1000 AUTO FILL KIT
Drill points or flat areas have been provided for the proper Auto Fill location on any side of
the Pump Vault. It is a good idea to completely install the pump, check valve assembly, and
discharge hose before you drill for the Auto Fill. This will help you determine the best side of
the Pump Vault to place the Auto Fill so that it has proper clearance on all sides. The center
point of the Auto Fill should be located approximately 1½ to 2" above the normal operating
water level of the basin. See Auto FIll Instruction Manual for installation instructions.
PV1700*
TT1500
B
TT2000
B
TT3000
B
TT4000
B
TT5000
0
TT6000
0
TT7500
N/A
TT9000
N/A
PAF-20
3
PAF-25
3
PAF-40
3
PAF-75
3
A-05
3
A-05L
2
A-21
2
PV7500
PV15000
B
H
B
H
B
H
B
H
0
5
0
5
N/A
4
N/A
4
N/A
7
N/A
7
N/A
7
N/A
7
N/A
7
N/A
6
N/A
6
9

Publicidad

Tabla de contenido
loading

Tabla de contenido