5. Assembly
Take 2 connections from the upright joints (B)
Take 2 lateral shelf supports (D)
Insert the 2 supports (D) between the 2 connections of the uprights (B) at the
desired height.
Use a mallet if necessary with a piece of wood for the operation.
Make sure that the elements are well fitted inside the slots.
Repeat the operation
Assemble the 2 sides by installing the shelf supports (C)
Add the central shelf supports (E)
Add the feet and end caps (G) to the 4 feet and to the top of the shelf.
Make sure all brackets are properly seated in the slots.
Install the connections (F) of the upright joints at the top.
Fit the pieces together correctly over the connections (F) and the uprights (B).