ledscom LC-L-243 Instrucciones De Montaje página 5

Luz de camino
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 8
1. Disconnect the building-side connecting
cable from the power supply and secure it
against being switched on again. To do
this, trip the corresponding circuit breaker
of the house installation.
2. Pull the bonding box (1) out of the
bollard light. Remove the cover of the
junction box (1). Loosen the strain relief
(2).
3. Connect the building-side connection
cable to the luster terminal inside the
junction box (1) as shown in Figure 3.
4. Fix the connection cable with the strain
relief (2) and close the connection box (1).
5. Now mount the bollard light on solid
ground or with a ground spike using the
enclosed screws and dowels (3).
6. Place the lamp in the luminaire as
shown in Figure 2.
7. Turn the power back on. The installation
is completed.
Subject to technical changes
LEDs Com GmbH, Dohrweg 2a, D-41066 Mönchengladbach, www.leds-com.de, Tel. +49 (0) 2161 - 5 75 99 76
English
Figure 1
Figure 2
1: Connection box
2: Strain relief
Figure 3
Path light (LC-L-243) - Assembly instructions
3: Screws and dowels
05/2022

Publicidad

Tabla de contenido
loading

Tabla de contenido