Right Weigh 310-PP Serie Manual De Instalación Y Operación página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATE & WEIGH
1: Park on a level surface. Shift the transmission to neutral and set the parking brakes.
2: Chock the wheels to prevent unexpected vehicle movement. Release the parking brakes.
3: Make sure the Height Control Valve (HCV) has fully inflated the air bags. If needed, briefly dump the air
from the suspension and allow the HCV to refill the system.
4: Pull the red push/pull valve so that it is in the fully open position. View the load scale to determine the
on-the-ground axle group weight.
5: Push the push/pull valve so that it is in the full closed position.
PUSH/PULL
VALVE
11

Publicidad

Tabla de contenido
loading

Tabla de contenido