Equipment Reception; General Description - Zonair3D PURE AIR CONTROL 500V Puesta En Marcha

Tabla de contenido

Publicidad

Thank you for choosing Zonair3D products.
Please take a few minutes to read this manual carefully before using your PURE AIR CONTROL

EQUIPMENT RECEPTION

On receiving the equipment, unpack the unit and check it is in correct condition.
Inspect it and check that there are no parts missing and that it has no knocks or
blows.
The equipment is supplied with:
- A box containing 8 attachment brackets or supports, which are sent separately
to be fitted on site to the frame of the machine. It includes 8 M6 Allen screws to
secure the equipment to the required surface.
- An individual absolute filter test certificate along with this start-up guide
Open the inspection panel to check that nothing has moved during transport,
making sure the pre-filter, the GRSystem and the absolute filter are correctly
in place and secure. The inspection panel can be opened by loosening the 8 M6
Phillips screws (4 on each side). These must be tightened again correctly to ensure
the unit remains sealed.

GENERAL DESCRIPTION

PRODUCT
FLOW
RANGE
(m
500
PAC 500
800
PAC 800
1200
PAC 1200
The equipment is supplied fully factory wired and programmed.
It includes the following different sections: G4 pre-filter, GRSystem
and H14 absolute filter.
6
Pure Air Control
MEASUREMENTS
/h)
3
H X W X L (mm)
310 x 972 x 1182
310 x 972 x 1182
346 x 972 x 1182
POWER
ELECTRICAL
(kW)
POWER SUPPLY
0,169
1F/230V, 50-60Hz
0,338
1F/230V, 50-60Hz
0,500
1F/230V, 50-60Hz
WEIGHT
AVAIL.
(Kg)
PRESSURE
(Pa)
84
355
85
280
92
460
gas filter, fan
TM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pure air control 800vPure air control 1200v

Tabla de contenido