SEQUENCE OF OPERATION
1. After initially loading a Rapid Fill
supply nozzle, the operator places the uninflated
bag in the open box. (See Figure 1)
Figure 1
2. The operator closes three of the four box flaps
leaving the flap in front open. The operator exerts
slight pressure on the three flaps and presses and
holds the air fill switch.
The operator continues to hold the button and
inflate the Rapid Fill
void in the box. (See Figure 2)
Figure 2
3. The operator removes the air supply nozzle and seals
the box closed. (See Figure 3)
NOTE: For a complete description of bag use,
see Using Rapid Fill
Figure 3
PAGE 2 OF 12
®
Bag onto the air
®
Bag until the bag fills the
®
Bags on page 4.
OVERVIEW
RAPID FILL
ULINE PART NO.
S-13698
S-5234
S-5235
S-5236
S-5237
S-5238
S-5239
RAPID FILL
One-way valve
Inflation port
®
BAG SIZES
MFG. PART NO.
SIZE (IN.)
RF-0
5 x 8"
RF-1
9 x 11"
RF-2
11 x 15"
RF-3
14 x 18"
RF-4
16 x 21"
RF-5
18 x 23"
RF-6
18 x 36"
®
BAG DESCRIPTION
SIZE (CM)
13 x 20 cm
23 x 28 cm
28 x 38 cm
36 x 46 cm
41 x 53 cm
46 x 58 cm
46 x 91 cm
Bag size
0722 IH-10157