Water Testing - Astralpool Lyriox UV-C Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 121
EQUAL AMOUNTS MUST BE VISIBLE
WATER TESTING THE QUARTZ, O-RINGS AND LOCKING NUTS
Now that the unit is in position and connected to pipework, the quartz sleeve and O-ring at
each end can be leak tested to ensure that they have been fitted properly. Failure to test for
EQUAL AMOUNTS MUST BE VISIBLE
leaks and improper installation at this stage may cause water to seep into and damage the
bulb socket and end cap flat washer.
EQUAL AMOUNTS MUST BE VISIBLE
STEP 1: Fit quartz sleeve, o-rings and
locking nuts.
STEP 3: Position and mount UV and
connect inlet and outlet connections.
STEP 5: Check locking nuts for signs of
water leaking.
STEP 7: If no water leaks, quartz sleeve
has been properly installed. Proceed to
connecting the UV to the power supply.
ENGLISH
STEP 2: Check the locking nuts are
hand tight only.
STEP 4: Connect up to pipework and
turn on pump to start water flow.
STEP 6: If water seeps from locking
nuts, check quartz sleeve installation.
See Troubleshooting on page 16.
Failure to test for leaks and improper
installation at this stage may cause
water to seep into and damage
the bulb socket and ballast. Water
damage from improper installation is
NOT covered under warranty.
12
EQUAL AMOUNTS MUST BE VISIBLE
WARNING

Publicidad

Tabla de contenido
loading

Tabla de contenido