IoT gateway – assembly/installation instructions
Assembly in MPS application
7.2 Assembly sequence
1. Align the DIN rail in the mounting position.
2. Fasten DIN rail with mounting material and screw in tight.
3. Hang the IoT gateway on the DIN rail and snap it into place.
14
© Festo Didactic 8176311