SIBRAPE SG20 Manual Del Usuario página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
ELECTRICAL GENERAL BOARD
220V NETWORK
The Chlorine Generator is installed after Residual Differential Device and Overload Protection Circuit Breaker.
There is no need to connect the Chlorine Generator together with the pump, as the Chlorine Generator has a flow
sensor that makes it turn on with the detection of the passage and water. For other installation methods, consult
technical support.
Cell controller (CPU)
1.
Find a place free of water and with low humidity;
2.
Fix the box using the side tabs;
3.
Provide power point;
4.
After fixed and energized, connect the Chlorine Generator to the CPU. To connect, just find the position
connector (there is only one way to fit it) and push the blue connector.
9
User's Guide

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sg35

Tabla de contenido