Descargar Imprimir esta página

Zenna Home 2156NN Instrucciones De Montaje página 10

Publicidad

STEP 8
NOTE: Make sure you are installing in a clean, dry and safe environment.
1. Compress top of the unit against the ceiling in the desired location.
2. Move the bottom end into place so that the unit is in a vertical position.
fig.1
tub ledge (opening height)
fig. 2
shower stall floor (opening height)
1-800-892-3986
IS02157-I
Pg 10 of 20

Publicidad

loading

Este manual también es adecuado para:

2156hbE2156nnE2156hb