2
1
3
4
2
1
3
4
15
SUPORTE AIRON WALL M F 35
- Transfer the holes of the base plate (1,
2
2, 3 and 4) to the wall for drilling them.
- Note that the rounded hole #1 must be
up.
-The oblong holes (2, 3 and 4) allows a
slight rotation adjustment when
tightening the fastening screws,
3
therefore the drilling on the wall must
be done as much centralized as
possible.
- Start attaching the base plate putting
2
all screws without completely
tightening them.
- Level the base plate using the spaces
of the oblong holes (2, 3 e 4). After
leveling start the final tightening in all
screws, beginning from the screw
3
attached on hole #1.