Descargar Imprimir esta página

OZ Lifting Products Aluma-Lite 1000 Manual Del Operador página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

Initial Crane Inspection
Check for damage during shipment. Do not install or use a damaged product. Be sure to maintain records
of product information and contact your OZ Lifting Products LLC® dealer with any problems that arise.
Refer to applicable codes and regulations before installing equipment. Contact a qualified professional to
obtain structure and foundation specifications for product mounting.
Before installing, select a location where the crane is:
• Visible throughout its entire operation.
• Free of traffic and any possible operational interference.
• Positioned so the operator is clear of both the load and the path of the wire rope.
• Accessible for maintenance.
• Attached to a strong, level foundation that can properly support it under all conditions.
• Removed from any corrosive, flammable, explosive, or potentially damaging materials.
Please refer to the diagram on pg. 8 before assembling the crane.
Inspect the crane to assure there are no missing or damaged parts. Do not discard the crane's shipping
containers as they can be reused if the crane needs to be repackaged. Contact you OZ Lifting Products
LLC® dealer if any problems arise.
Assure that all components, including the pin that the load sheave rides on, are properly lubricated before
assembling. Refer to Cleaning & Lubricating the Crane on pg. 11.
During assembly, perform an inspection according to the procedures found on pgs. 11, 12 and 13 on this
document and resolve any issues. This will provide a comparison for later inspections.
Installing the Base
NOTE: The accompanying base for the Aluma-Lite® Davit Crane is sold separately through
OZ Lifting Products LLC® dealers. It is necessary for proper operation of this product.
The base of the Aluma-Lite® 500 - OZA500DAV must be securely fastened to the foundation using ½-13-
inch coarse thread fasteners of at least grade 5. A torque of 75 ft-lb should be used for grade 5 fasteners
without lubrication.
The base of the Aluma-Lite® 1000 - OZA1000DAV must be securely fastened to the foundation using
⅝-11-inch coarse thread fasteners of at least grade 5. A torque of 80 ft-lb should be used for grade 5
fasteners without lubrication.
Assure that mounting surface is located directly above a strong, level, solid foundation that supports the
crane under all circumstances.
Non-standard products that have been altered from the original design may require alternative fastening
requirements. Contact your OZ Lifting Products LLC® dealer for more information.
EN pg.6

Publicidad

loading

Este manual también es adecuado para:

Aluma-lite 500Oza1000davOza500dav