2. SAFETY
This symbol indicates that the operator must refer to an explanation in the Operating Instruction
for further information.
Earth ground
Danger Voltage
Double insulation
CAUTIONS:
• Before operating measurement, the meter must be warm-up for 30 seconds;
• Inspect the condition of the test leads and the meter itself for any damage before operating
the meter;
• Always remove the test leads before replacing the battery or fuses;
• Use great care when making measurements if the voltages are greater 30VAC RMS or 60V DC,
these voltages are considered a shock hazard;
• To avoid damages to the meter, do not exceed the maximum limits of the input values shown
in the specification;
• Always discharge capacitors and remove power from the device under test before performing
Diode, Resistance or Continuity tests;
• Once "
" appears in LCD, to replace the battery for accurate readings.
30