Descargar Imprimir esta página

EdilKamin R Instalación Uso Y Mantenimiento página 22

Kits hidráulicos

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 44
INSTALLATION
INSTALLATION PREREQUISITES
The HYDRAULIC KIT is supplied with a paper template (X) which aids in positioning the hydraulic piping for connection to the
boiler.
Taking into consideration the maximum overall dimensions of the boiler (Z), it is possible to derive the correct position of the
hydraulic attachments.
As shown in the picture below, the template should be placed at floor level and aligned with the left side of the maximum overall
boiler dimensions (Y).
NB: the outlines of the larger holes must be positioned to the left (when looking at the wall from the front).
Remember to adhere to the installation distances specified in the product data sheet.
W
Y
Z
X
- 22
-

Publicidad

loading

Este manual también es adecuado para:

RwR2Rw2