1. Disconnect the building-side connecting
cable from the power supply and secure it
against being switched on again. To do
this, trip the corresponding circuit breaker
of the house installation.
2. Remove the base (1) by loosening the
two screws (2).
3. Loosen one of the two sleeves (3) and
guide the building-side connection cable
into the luminaire. Then tighten the sleeve
hand-tight. Proceed with an outgoing cable
on the a
4. Connect the wires of the cable according
to "Figure 2".
5. Replace the base (1) and tighten it with
the screws (2). Make sure that the sealing
rings (6) are inserted correctly.
6. Now remove the threaded ring (7)
together with the washer (8) and sealing
ring (9) (turn counterclockwise) and insert
a suitable GU10 bulb. Reinsert the
threaded ring (7) together with the washer
(8) and sealing ring (9) and tighten them
hand-tight.
7. Screw the ground spike (10) to the light.
The installation is now complete.
Subject to technical changes
LEDs Com GmbH, Dohrweg 2a, D-41066 Mönchengladbach, www.leds-com.de, Tel. +49 (0) 2161 - 5 75 99 76
English
Figure 1
1: Floor
2: Screws
3: Sleeves
4: Dummy plug
5: Sealing ring
Figure 2
Garden spotlight (LC-L-338) - Assembly instructions
6: Sealing rings
7: Threaded ring
8: Slice
9: Sealing ring
10: Ground spike
03/2023