Descargar Imprimir esta página

NuTone QTN130E Manual Del Usuario página 4

Ocultar thumbs Ver también para QTN130E:

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALL GRILLE
6. Finish ceiling.
Install ceiling material. Cut out around housing.
7. Attach grille
to housing.
Squeeze grille
springs and insert
them into tabs
on each side of
housing.
8. Push grille
against
ceiling.
SERVICE PARTS
Key No.
Part No.
1
97016466
Housing
2
97018562
Duct Connector - 6"
3
98010102
Wiring Plate
4
99170245
Screw, #8-18 X .375
5
97018010
Wire Panel/Harness Assembly
6
97016591
Blower Assembly
7
97018427
Grille Assembly
(includes key no. 8)
8
99140199
Grille Spring (2 req'd)
9
97018014
Spacer (2 supplied)
10
99420665 Thumbscrew, #8-18 x .375
11
475
Duct Reducer - 6" to 4"
Order service parts by "Part No." - not by "Key No."
Description
Replacement parts
can be ordered on our
website. Please visit us
at www.nutone.com
SERVICE NOTE
To remove Blower
Assembly:
Unplug motor.
Remove
thumbscrew (10)
from motor plate
flange.
Find the single TAB
on the motor plate
(located next to the
receptacle).
Push up near motor
plate tab while
pushing out on side
of housing. Or insert
a straight-blade
screwdriver into slot
in housing (next to
tab) and
twist screwdriver.
MODEL QTN130E
Page 4
99044679A

Publicidad

loading