Descargar Imprimir esta página

Glacier bay HD66289W-6101 Guía De Instalación Y Cuidado página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
1
Installing the faucet assembly
CAUTION: Always shut off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
Shut off the water supply. Remove the old
faucet.
Clean the mounting surface.
Remove the preassembled lock nut (D) and
washers (B & C) from the new faucet (A).
Align the hole in the gasket (F) and deck plate (E)
with the mounting hole in the sink. Place the
faucet (A) through the deck plate (E) and mounting
hole in the sink until the faucet (A) sets on top of
deck plate (E).
Secure the faucet (A) to the sink using the
washers (B & C) and lock nut (D) provided.
NOTE: When you insert the lift rod (P), the lift rod (P) can
go through the faucet (A) and down into the slot of the
washers (B & C). If the sink is uneven, use silicone under
the gasket (F).
1
2
A
E
F
D
B
C
D
2
Preparing the pop-up assembly
Remove the pop-up stopper (G) and drain
ange (H) from the drain body (K).
K
4
G
H

Publicidad

loading

Este manual también es adecuado para:

Hd66289w-6104