Connection of current sensor
Direct the three phases leading from the main fuse to the consumer through the
n
current sensor.
Connect the 6-conductor control cable of the inverter according to the
n
connection plan. The control cable may have a wire cross-section of 0.75 mm² to
2.5 mm² and a maximum length of 20 m.
The length of stripped insulation is 8-9 mm.
Install the inverter cover and screw it tight (5 Nm).
n
Switch on fuses again.
n
Switch on the inverter.
n
Activate the current sensor in the inverter under the menu point
n
"Settings > Hardware settings > Current sensor position".
To this purpose, choose the corresponding mode.
0 - no current sensor installed
1 - current sensor position for measurement of building consumption (standard)
2 - current sensor position for measurement of grid feed-in
(possible with PIKO BA)
The current sensor is connected.
H
IMPORTANT INFORMATION
When carrying out the three phases through the current sensor, it
is imperative that the following points are observed:
n It must be ensured that the phase sequence (L1, L2, L3) through
the current sensor agrees with the phase sequence at the
inverter and the sensor connections.
30
Fig. 6: Current sensor connection in the inverter
L1.k L1.l L2.k L2.l L3.k L3.l
DE
EN
FR
ES
PL
PT
IT
DK
NL
GR
TR
31

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mbs asrd 14

Tabla de contenido