Descargar Imprimir esta página

Chauvet Professional DRB-F50CM Guía De Referencia Rápida página 3

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Product Dimensions
Removing the Hoist Ring (Optional)
To remove the hoist ring from the DRB-F50CM:
1. Remove the split pin from the pin hole in the castle nut locking the hoist ring in place.
2. Unscrew the castle nut from the hoist ring.
3. Lift the hoist ring out of the product.
4. To re-install the hoist ring, reverse the previous steps.
Hoist Ring Assembly
Warning! Replacing the hoist ring with other hardware may change the load capacity of the product!
DRB-F50CM QRG Rev. 1
QUICK REFERENCE GUIDE
19.67 in
499.8 mm
19.98 in
507.6 mm
5.2 in
4.72 in
132 mm
120 mm
2.36 in
60 mm
Hoist Ring
Pin Hole
Castle Nut
Split Pin
EN
6.65 in
169 mm
2

Publicidad

loading

Este manual también es adecuado para:

23091602