Descargar Imprimir esta página

RAVAK SUPERNOVA SKKP6 Serie Instrucciones De Montaje página 5

Ocultar thumbs Ver también para SUPERNOVA SKKP6 Serie:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12
GB
ASSEMBLY INSTRUCTIONS
1.
Check the completeness of delivery before assembly. Before drilling the dowel holes it is imperative to
check the wall for inner electricity lines and water pipes.
2.
Position the shower enclosure (with the wall connecting profiles) onto the shower tray, adjust the correct
position and mark the holes on the wall.
3.
Remove the wall connecting profiles from the frame and mark the holes for the dowel plugs.
4.
Drill the holes and insert dowel plugs
5.
Fix the wall connecting profiles to the wall using screws
6.
Slide the shower enclosure into the wall connecting profiles, adjust and try the correct function.
Æ
7.
Drill the holes
2,6 mm into the frame of the shower enclosure. Fix it with screws
8.- 9.
Use silicone sealing compound. Seal between the shower tray, the shower enclosure and the
surround. The a. m. operation must be done by means of the silicone RAVAK PROFESSIONAL which has
excellent cohesion. If another putty is used you run a risk it will not be water resistant.
10.
Both shower tray and polystyrene glass are protected by thin plastic foil. Do not forget to remove it
before using the enclosure.
11. The assembly is done outside the tray. Attention: Textured side of glass facing outwards.
Remove the wall connecting profiles from the shower enclosure and the angle connecting profile from the
fixed wall. Secure the shower enclosure to the fixed wall using the angle connecting profile. Slide the wall
connecting profiles on the free sides of the shower enclosure and fixed wall. (The rounded side out).
Position the shower enclosure onto the tray, adjust and mark the position of the wall connecting profiles on
the wall. Mark the position in the angle connecting profiles on the frame. Place the whole shower enclosure
outside the tray, remove the fixed wall, drill the holes
Æ
3,5/13 mm.Then follow points 4 to 6. Use the prepared holes, drill and screw together frames with wall
connecting profiles or angle connecting profile using screws
IMPORTANT INFORMATION!
When maintaining the shower bath, only wipe the painted parts, glass and plastic, using a fine cloth and
normal household detergents. Never use abrasive pastes, solvents, acetones or similar substances. The
manufacturer is not responsible for damage caused by inappropriate use, installation or maintenance of
the product. The manufacturer is entitled to continuous innovation of the product. For all other information
concerning the mounting, use and maintenance, ask your salesperson. The guarantee is 24 months from
the date of sale. The manufacturer recommends: RAVAK ANTICALC CONDITIONER - is a preparation
which perfectly renews and maintains all the qualities of the RAVAK ANTICALC protective coating; RAVAK
CLEANER - works to remove old and dried-on debris from glass surfaces, shower frames, enamel and
acrylic bathtubs, washbasins and water taps; RAVAK DESINFECTANT - is
considerable anti-bacterial and anti-fungal effects.
tel.: 318 427 111, fax: 318 427 269, e-mail: info@ravak.cz, www.ravak.cz, www.ravak.com
Æ
8 mm
RAVAK a.s., Obecnická 285, 261 01 Pøíbram 1, ÈR
Æ
4/40 mm.
Æ
2,6 mm into the frame and fix together using screws
Æ
3,5/13 mm. Then follow points 8 to 9.
SKCP4, SKKP6
SKCP4, SKKP6
Æ
3,5x13 mm.
a special preparation with

Publicidad

loading