Descargar Imprimir esta página

Glacier bay GBBA014 Manual De Instalación página 9

Publicidad

SECUREMENT / FIXATION / ASEGURAMIENTO
BEFORE FIXING YOUR TUB TO
THE FLOOR, MAKE SURE YOU
HAVE INSTALLED YOUR FAUCET
(if applicable) AND THAT YOU
HAVE CHECKED FOR LEAKS.
1. Test for leak by filling up the tub and let it
drain. Then check all plumbing connections
for leaks.
2. Fix the bathtub to the floor by applying
a strong Tub & Tile Adhesive under each
edges of the tub that will be in contact with
the floor: The rim, the lateral bars and the
feet.
3. Finally, for a professional finish, draw a
bead of silicone around the base.
4. Let dry 24h.
AVANT DE FIXER VOTRE BAIN,
S'ASSURER D'AVOIR INSTALLER
VOTRE ROBINET (si applicable) ET
S'ASSURER DE TESTER POUR LES
FUITES.
1. Tester pour les fuites en remplissant
votre bain, puis laisser le s'écouler.
Ensuite, inspecter toute la plomberie.
2. Fixer le bain en appliquant un puissant
adhésif pour bain et tuile sous chacune
des parties en contact avec le plancher: le
contour, les lattes latérales, et les pattes.
3. Finalement, pour un fini professionnel,
appliquer un trait de silicone autour de la
base.
4. Laisser sécher 24h.
24h
ANTES DE ASEGURAR SU BAÑO,
ASEGÚRESE DE QUE PARA LA
INSTALACIÓN DE LA VÁLVULA (si
corresponde) Y ASEGÚRESE DE
QUE PARA BUSCAR FUGAS.
1. Buscar fugas rellenando el baño y dejar
escurrir. A continuación, inspeccione todas
las cañerías.
2. Fijar el baño mediante la aplicación de
un fuerte adhesivo para baldosas de cuarto
de baño y en cada una de las partes en
contacto con el suelo: el contorno, listones
laterales y las piernas.
3. Por último, para un acabado profesional,
aplicar una línea de silicona alrededor de
la base.
4. Dejar secar 24h.
p. 9

Publicidad

loading