Descargar Imprimir esta página
ZUCCHETTI BELLAGIO Z93762 Instrucciones Para La Instalación

ZUCCHETTI BELLAGIO Z93762 Instrucciones Para La Instalación

Publicidad

Enlaces rápidos

I
GB
F
D
E
RU
PL
Z93762
Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it
BELLAGIO
ISTRUZIONI PER L'INSTALLAZIONE DELLA RUBINETTERIA
INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS
INSTRUCTIONS POUR L'INSTALLATION DE LA ROBINETTERIE
MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN
INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA
ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ
INSTRUKCJE INSTALACJI ARMATURY
ZUCCHETTI RUBINETTERIA S.p.A.
ZB1699
ZB2699

Publicidad

loading

Resumen de contenidos para ZUCCHETTI BELLAGIO Z93762

  • Página 1 INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ INSTRUKCJE INSTALACJI ARMATURY Z93762 ZB1699 ZB2699 ZUCCHETTI RUBINETTERIA S.p.A. Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it...
  • Página 2 ZB1699 / ZB2699 INSTALLAZIONE / INSTALLATION 17mm ZB1699/ZB2699 (mm) 10-15 16-22 23-28 29-34 35-40...
  • Página 3 ZB1699 / ZB2699 INSTALLAZIONE / INSTALLATION...
  • Página 4 ZB1699 / ZB2699 INSTALLAZIONE / INSTALLATION...
  • Página 5 ZB1699 / ZB2699 / Z93762 INSTALLAZIONE / INSTALLATION...
  • Página 6 ZB1699 / ZB2699 / Z93762 INSTALLAZIONE / INSTALLATION...
  • Página 7 Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.

Este manual también es adecuado para:

Bellagio zb1699Bellagio zb2699