Descargar Imprimir esta página

Lemeks Palmako PA44-4242 Instrucciones De Montaje, Instalación Y Mantenimiento página 21

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
Installation manual - English
Walls
When installing the walls, it is important to remember that:
➢ The logs are always assembled with their tongue upwards!
➢ If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer!
Install the walls in accordance with the appended wall plans (see Technical specifications).
The first layer of logs:
Place the first layer of wall logs on the base frame as shown on the picture that is wall logs and half logs in
turns. Make sure that the first layer of logs would reach ca 5 mm over the foundation joists. This way you
will protect the garden pavilion against moisture, so the rainwater could easily flow into the ground.
Now remove carefully the wall logs and attach half logs with 4,5x70mm screws to the foundation as shown
on the picture. Put the wall logs back to their place.
ATTENTION: Make sure that the measurements of the foundation would be the same as given in the
Technical specifications.
Continue the installation of the walls according to the wall plans by strongly forcing the wall logs into one
another. If necessary, use the hitting block and hammer. At the same time, do not forget to begin the
installation of the door and windows.
th
th
You should definitely begin the door installation after the 5
-6
layer of logs.

Publicidad

loading

Este manual también es adecuado para:

106185106186106188106187