Descargar Imprimir esta página

Delta 5CN-220T Serie Instrucciones página 3

Bano de vapor exterior

Publicidad

Installation
1
Instalación
Installation
1. Pre-Installation - Control Location
a. The 5CN-220 series control must be installed outside the steamroom. For convenience the recommended height from the floor is four feet
(see Figure 4). Provide a 1½" hole in the wall at this location (see Figure 1).
IMPORTANT: Multi-conductor cable must be installed so that the end will not be buried inside the wall.
2. Electrical Rough-in
a. Remove the multi-conductor cable from the control packing box. Carefully route the multi-conductor control cable from the steam generator
to the 5CN-220 series control located outside the steamroom. Route multi-conductor cable through a ¾" conduit to protect the cable from
damage and to facilitate replacement if necessary (see Figure 1).
3. Control and Cable Installation
a. Locate the previously installed cable and black plastic strain relief clamp which is in the control packing box. Locate the knockout on the
steam generator for the control cable (see Figure 3).
b. Place strain relief around cable about seven inches from the end and insert into the hole. Remove the protective covering labeled "Remove
Before Installation" from the modular jack found on the PC board.
c. Remove the protective cap from the multi-conductor cable plug. Connect the cable to an available modular jack.
d. Close and secure generator cover.
e. Locate Telco Jack at female coupler, on back of the 5CN-220 series control. Remove the protective covering labeled "Remove Before
Installation". Remove protective cap from cable and plug into jack. Check that the orientation of the plug properly aligns with the jack.
A snap will indicate the plug is installed correctly (see Figure 2).
f. Peel adhesive liner from back of the control. Apply the control to the wall. Press firmly and hold for a few seconds (see Figure 2).
Figure 1
IMPORTANT: Run the
Control Cable through
a ¾" conduit.
1½" Hole
located four feet
from the floor
Figure 3 - Cable Installation on Steam Generator
WARNING
!
Test the control for operation before continuing on to the next step. The 5CH
model control must be installed first before you can test this control.
To Steam Generator
Coupler
2
1
¾" Conduit
To Control
Figure 2
Adhesive Liner
3
Control Cable
to Generator
Modular Jacks:
All modular jacks are
identical and work in
any combination.
Connect to any jack.
Coupler
113377 Rev. G

Publicidad

loading

Este manual también es adecuado para:

5cn-220r serie5cn-220t-pn-pr5cn-220r-bl5cn-220t-ks-pr5cn-220r-pn-pr5cn-220t-bl ... Mostrar todo