Descargar Imprimir esta página

IMEON ENERGY IMEON 3.6 Guia De Instalacion página 12

Montaje en paralelo
Ocultar thumbs Ver también para IMEON 3.6:

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Installation
Please respect inverter requirements (see IMEON 3.6/9.12 installation guide).
2.1 Mounting Location
FR
FR
EN
FR
IT
ES
2.2 Recommended equipment
In addition to recommended equipment for IMEON 3.6 and IMEON 9.12 (see installation guide), below material
is necessary for parallel operation of "N" inverters:
Smart Meter:
Battery (in case of CAN communication):
2.3 Parallel and standard inverters
Only dedicated inverters equipped with a parallel connection card (see chapter 2.3.2) can be used for parallel
connection. Do not use standard inverters that are not equipped with a parallel connection card for mounting
in this configuration.
If your project requires the installation of parallel inverters, ask your dealer to specifically offer you parallel
IMEON inverters.
The maximum number of inverters that can be used in parallel configuration is 6.
Parallel_assembly_installation_guide_v3.3
IMEON PARALLEL
Important: The inverters must be at least 50cm apart
and positioned at a minimum height of 50 cm.
1 x splitter RJ45 with N entries or N-1 x splitter RJ45 type 'T'
o
o
N+1 x Ethernet cable (including 1 cable wiring according to IMEON 3.6/9.12 installation guide -
meter instructions)
1 x splitter RJ45 with N entries or N-1 x splitter RJ45 type 'T'
o
o
N+1 x Ethernet cable (wiring according to IMEON 3.6/9.12 installation guide - battery
instructions)
12

Publicidad

loading

Productos relacionados para IMEON ENERGY IMEON 3.6

Este manual también es adecuado para:

Imeon 9.12