Descargar Imprimir esta página

HAMPTON BAY HBLG1200H Manual Del Propietário página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

SUGGESTED
TOOL REQUIREMENTS
SCREWDRIVER(+,-),
RULLER, KNIFE, HAMMER,
PENCIL,
LEVEL
PREPARATION
OF CHASSIS
1, Remove the screws which fasten the cabinet
at: both sides and at the back.
2. Slide the unit from the cabinet by' gripping the
base pan handle and pulling forward while
bracing the cabinet.
3. Remove
EPS Material.
4, Cut the window sash seal to the proper length.
Peel off the backing and attach the foam-pc
@
to the underside
of the window sash.
5, Remove the backing from the top upper guide
Foam PE @ and attach it to the bosom of the
upper guide Q,
6. A_ach the upper guide onto the top of the
cabinet with 3 type A screws.
7. insert the frame guides @ into the bottom of
the cabinet.
8. insert the Frame Curtain
O) into the upper
guide @ and frame guides @.
9, Fasten the curtains
to the unit with 4 Type A
screws.
(Type
A}_.
i
Shipping
screws
EPS Matedal
CABINET
INSTALLATION
1. Open the window. Mark a line on center of the
window stool(or desired
air conditioner
location).
Carefully
place the, cabinet on the window
stool and align the center mark on the bottom
front with the _nter
line marked in the
window stool.
2, Pull the bottom window sash down behind the
upper guide until it meets.
NOTE:
• Do not puli the window sash down so tightly
that the movement
of Frame Curtain is
restricted.
(Type A)
Upper
Guid_indow
;_gll
Window
Upper guide
Foam-
Fig. 2
-10-

Publicidad

loading