Step 5: INSTALLATION
The hood is particularly suitable for installation in a flue or
chimney.
To ensure optimum extraction performance
(especially important for kitchen island solutions):
Q)
install the hood as high as possible within the structure
Q1 The structure must cover the entire cooking area.
rN
CAUTION — Ensure that the minimum distance
between the cooktop and the hood is maintained — 30".
1.
Make sure all connections (ductwork, blower, remote
control, power supply) are complete.
2.
Remove the filter grill (see operating instructions).
3.
Push the hood up into the installation opening until
the installation aid locks into position at the front and
rear.
4.
Mount the hood. Note: The screws must be consis-
tently and diametrically tightened.
Note: If hood must be removed, unlock the mounting
aids by pushing them inward.
Step 6: VERIFY INSTALLATION,
OPERATION AND COOKTOP ALIGNMENT
Before performing this procedure, verify that all packing
materials were removed and that the grease filters have
been properly installed. Refer to the Care and Use Manual
for instructions regarding filter installation.
A.
Turn the blower ON by selecting each of the
three speeds in turn. Let the blower run several
minutes at each speed to check its operation.
B.
With the blower on HIGH, close the windows and
doors to the area to ensure that fan does not cause
backdrafting in any outlet vent for another
appliance.
C.
Turn the light on and off.
D.
Press the DELAY SHUT-OFF button. Wait 10 minutes
to see if the hood switches off.
if the vent system does not operate satisfactorily during
any of the above procedures, review all steps in these
installation instructions to ensure that nothing has been
omitted or overlooked. Also refer to the Care & Use
Manual for additional information, or call Thermador
Customer Support at 1-800-735-4328.
PAGE 8