Descargar Imprimir esta página

CRISTINA EAST SIDE CRIES226 Instrucciones De Montaje

Publicidad

Enlaces rápidos

MANUTENZIONE E PULIZIA - MAINTENANCE AND CLEANING - MAINTENANCE ET NETTOYAGE - PFLEGE UND REINIGUNG - MANTENIMIENTO Y LIMPIEZA -
UDR BA A IŠT NI - UDR BA A ISTENIE
sempre
substances or their derivatives, such as hydrochloric acid, muriatic acid, sulphuric acid, caustic soda, etc., and in any case do not use abrasive supports (e.g. metal or non-
Always make sure to rinse thoroughly in order to avoid the deposit of any residual cleaning product.
Toujours
siempre
GARANZIA - GUARANTEE - GARANTIE - GARANTIE - GARANTÍA - ZÁRUKA - ZÁRUKA
Tutti i prodotti
All
Tous les produits
Alle
DATI TECNICI - STANDARD SPECIFICATIONS - DONNEE TECHNIQUES - TECNISCHE STANDDARDDATEN - DATOS TÉCNICOS - TECHNICKÉ UDAJE - TECHNICKE UDAJE
1.
2.
Maximální pracovní tlak
3.
4.
For thermostats:
Für Thermostat:
5.
Für Thermostat:
6.
7.
8.
immer, dass Sie sorgfältig nachspülen, um Ablagerungen von
Presión max. de ejercicio
For thermostats: Pressure difference between hot and cold water
EAST SIDE
CRIES226 | CRIES248 | CRIES326 | CRIES948 | CRIES376
ISTRUZIONI DI MONTAGGIO
INSTALLATION INSTRUCTIONS
NOTICE DE MONTAGE
MONTAGEANLEITUNG
INSTRUCCIONES DE MONTAJE
CRIES226
155
305
ø33
max.40
Le test d'installation en
360
G3/8
CRISTINA S.r.l. a socio unico
CRIES248
155
237
435
368
max.40
ø33
ø64
360
ø64
5-55
ø41
ø50
5-55
G1"1/4
G3/8
G1"1/4
CRIES326
130
185
143
max.40
ø33
360
ø64
5-55
G3/8
ø41
ø50
G1"1/4
ø41
ø50

Publicidad

loading

Resumen de contenidos para CRISTINA EAST SIDE CRIES226

  • Página 1 For thermostats: Pressure difference between hot and cold water Für Thermostat: max.40 ø33 ø33 max.40 ø64 Le test d’installation en 5-55 G3/8 ø41 max.40 ø33 ø64 ø50 G1"1/4 G3/8 ø64 5-55 ø41 ø50 5-55 ø41 G1"1/4 G3/8 ø50 G1"1/4 CRISTINA S.r.l. a socio unico...
  • Página 2 MONTAGGIO E PEZZI IDENTIFICATIVI DI RICAMBIO - INSTALLATION AND SPARE PARTS - MONTAGE ET PIECES INDENTIFICATION L’INSTALLAZIONE DEVE ESSERE ESEGUITA DA PERSONALE QUALIFICATO! DE RECHANGE - MONTAGE UND ERSATZTEILE - MONTAJE E IDENTIFICACIÓN DE LAS PIEZAS DE RECAMBIO SPURGARE LE TUBAZIONI PRIMA DI COLLEGARE IL RUBINETTO ALL’IMPIANTO. INSTALLATION PERFORMED BY QUALIFIED PERSONNEL! BEFORE CONNECTING TO MAINS, BLEED THE PIPES TO AVOID DAMAGE.

Este manual también es adecuado para:

East side cries248East side cries326East side cries948East side cries376