Descargar Imprimir esta página

GE AEW18 Serie Manual Del Propietario E Instrucciones De Instalación página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

installation instructions
D PREPARETHE AiR CONDiTiONER
(continues)
[_
Remove
the ground
screw
from
the left
side of the case.
Keep it in a safe location.
NOTE: Be sure to save this screw. You will need
them later in the installation.
[]
Slide the air conditioner
from
the case by
gripping
the base pan handle
and pulling
forward
while
bracing
the case. Do not
pull or lift on the styrofoam
discharge
area.
Do not
pull
area--
damage
to the
unit may
result
FRONT
D PREPARETHE CASE
[]
Attach
the top
rail gasket
to the bottom
of the top rail.
r_ Install the top mounting
rail with 4 type A
screws from the inside of the case. Press
firmly
to drive the screws
into the gasket
and through
the top mounting
rail.
D PREPARETHE CASE
Slide each side retainer
onto the edge of
each according
panel.
The figure
shows
teh
orientation
of each accordion
panel and side
retainer
assembly
relative
to the case from
a
top view of the unit.
SIDE
RETAINER
[]
Slide the left and right
accordion
panels
into the top and bottom
mounting
rails.
Top mounting
rail
Top right
Top left
_
_{
_/
/
Bottom
mounting
rail
Attach
the side retainers
to the case using 6
type A screws.
0

Publicidad

loading